MSCBSC 移动通信论坛
搜索
登录注册
网络优化工程师招聘专栏 4G/LTE通信工程师最新职位列表 通信实习生/应届生招聘职位

  • 阅读:3323
  • 回复:0
阿尔卡特bts加机柜扩容英文版
gfl803160

鎵嬫満鍙风爜宸查獙璇


 发短消息    关注Ta 

积分 92
帖子 19
威望 1176 个
礼品券 0 个
专家指数 -3
注册 2010-10-29
回答问题数 0
回答被采纳数 0
回答采纳率 0%
 
发表于 2011-06-19 16:31:02  只看楼主 
【资料名称】:阿尔卡特bts加机柜扩容英文版

【资料作者】:上海贝尔

【资料日期】:2011.1.1

【资料语言】:英文

【资料格式】:PDF

【资料目录和简介】:

The logical configuration can be activated completely independently from the
physical connection of the BTS. Creating adjacencies and call tests must be
done after the BTS is functional and connected to the network.
Co-ordination is needed between the BTS and OMC-R sites to define the initial
settings. The Q1 address must always be set. For 9100/9110 Micro BTSs, the
transmission mode is configured via OML.
In order to create the required configuration, it is possible to add more than one
new BTS and more than one cell. In this case, modify all the logical parameters
at the same time in the same PRC.
G1 and G2 BTS are not supported in the current release.

查看积分策略说明
附件下载列表:
2011-6-19 16:31:02  下载次数: 3
增加机柜扩容.pdf (172.12 KB)
扫码关注5G通信官方公众号,免费领取以下5G精品资料
  • 1、回复“YD5GAI”免费领取《中国移动:5G网络AI应用典型场景技术解决方案白皮书
  • 2、回复“5G6G”免费领取《5G_6G毫米波测试技术白皮书-2022_03-21
  • 3、回复“YD6G”免费领取《中国移动:6G至简无线接入网白皮书
  • 4、回复“LTBPS”免费领取《《中国联通5G终端白皮书》
  • 5、回复“ZGDX”免费领取《中国电信5G NTN技术白皮书
  • 6、回复“TXSB”免费领取《通信设备安装工程施工工艺图解
  • 7、回复“YDSL”免费领取《中国移动算力并网白皮书
  • 8、回复“5GX3”免费领取《 R16 23501-g60 5G的系统架构1
  • 对本帖内容的看法? 我要点评


    作者的更多帖子
     

    快速回复主题    
    标题
    内容
     上传资料请点左侧【添加附件】

    (勾选中文件为要删除文件)


    当前时区 GMT+8, 现在时间是 2026-04-18 04:58:08
    渝ICP备11001752号  Copyright @ 2006-2016 mscbsc.com  本站统一服务邮箱:mscbsc@163.com

    Processed in 0.418014 second(s), 14 queries , Gzip enabled
    TOP
    清除 Cookies - 联系我们 - 移动通信网 - 移动通信论坛 - 通信招聘网 - Archiver